## How to Write an RFQ for Custom Protective Cases (Buyer Checklist)

Direct answer

A case RFQ that gets accurate quotes states twelve things: payload dimensions and weight; quantity forecast per year; sealing requirement (IP target); drop/impact target with standard and height; temperature range; shell material preference or openness; interior type (foam layout, panels); branding; compliance documentation needed; delivery terms (Incoterm and port); target launch date; and whether tooling exists or must be built. Missing any of these invites a quote built on assumptions.

## §01The checklist

| # | Field | Why it matters to the quote |
|---|---|---|
| 1 | Payload dims + weight + fragility | drives size, foam stack, wall thickness |
| 2 | Annual + per-order quantity | decides process (injection vs roto) and MOQ |
| 3 | Ingress protection target | gasket class, valve, test budget |
| 4 | Drop/impact target (standard + height) | shell engineering and validation cost |
| 5 | Temperature / UV exposure | resin compound selection |
| 6 | Material preference or openness | keeps alternates on the table |
| 7 | Interior: foam layout / dividers / panels | CNC programming and unit cost |
| 8 | Branding (process + colors) | setup items and MOQ |
| 9 | Compliance / test documentation | third-party lab vs in-house report |
| 10 | Incoterm + port (e.g. FOB Shenzhen) | logistics scope must be unambiguous |
| 11 | Launch date + milestones | existing mold (~45 d) vs new tooling (~125 d) |
| 12 | Tooling status: existing / new / modified | the single biggest cost and time driver |

## §02What to attach

- **3D file** (STEP preferred) of the payload, plus a 2D drawing with tolerances on critical interfaces.
- **Photos of the environment of use** — a case for a survey crew and one for a server rack read differently to an engineer.
- **A reference case you like,** with notes on what to keep and what to change; this compresses two rounds of back-and-forth into one.

**Red flags in supplier replies:** quotes without a stated wall thickness, resin grade or foam density are placeholders. Ask each bidder to state those three numbers; the spread between real factories and resellers shows immediately.

## Frequently asked questions

### What information does a case supplier need for an accurate quote?

At minimum: payload dimensions and weight, annual volume, IP and drop targets, temperature range, interior type, branding, Incoterm and whether tooling exists. The more of the 12-field checklist you fill, the fewer assumptions in the price.

### Should I reveal my target quantity in an RFQ?

Yes. Quantity determines process choice, MOQ and unit economics — quoting at 500 pieces and at 50,000 pieces are different engineering exercises. Honest forecasts get honest designs.

### Do I need a 3D file to get a quote?

For a stock case with custom foam, good photos and dimensions suffice. For a fully custom shell, a STEP file of the payload (and any mounting interfaces) prevents the most expensive kind of misunderstanding.

### What is a realistic lead time to state in the RFQ?

Roughly 45 days for production on an existing mold and about 125 days when new tooling is required, from drawing freeze to shipment. Anything quoted dramatically shorter should trigger questions about validation depth.

## Related guides

[KB-TOL-014Injection Molding vs Rotomolding for Custom Cases: Tooling Economics](https://kexinn.org/injection-vs-rotomolding-tooling/)[KB-QC-016Pre-Shipment Inspection for Protective Cases: What to Check and AQL Basics](https://kexinn.org/case-pre-shipment-inspection/)[KB-LOG-017Export Packing for Protective Cases: Master Cartons, Pallets and Container Loading](https://kexinn.org/export-packing-and-container-loading/)