DOC **KB-QC-016**REV 2026-09-21CLASS: PUBLIC

## Pre-Shipment Inspection for Protective Cases: What to Check and AQL Basics

Direct answer

A protective case shipment is inspected against a sampling plan — commonly AQL 2.5 for major defects and 4.0 for minor defects under ISO 2859-1 (ANSI/ASQ Z1.4), General Inspection Level II — but sampling only works when the checklist is functional, not cosmetic: latch actuation, gasket compression, hinge play, foam fit, laser/print quality, and the drop or seal tests agreed in the purchase contract.

## §01The 8-point functional check

1. **Latch actuation:** open/close 20× per sampled case; no sticking, full preload at close.
2. **Gasket contact:** paper-strip pull test around the lid — uniform resistance everywhere.
3. **Hinge play:** lid must not wobble laterally more than the drawing allows.
4. **Pressure valve:** membrane intact, moves freely; press test for reseal.
5. **Foam fit:** payload (or mock) inserts with defined resistance, notches aligned.
6. **Surface:** sink marks, flash, texture damage logged as defects — distinguish cosmetic vs structural.
7. **Hardware torque:** screws at hinges/handles torqued per spec, thread-lock present where specified.
8. **Marking:** logo, serial and IP marking present and correctly placed per the approved sample.

## §02AQL in one minute

You and the supplier agree acceptance quality limits (AQL) in the contract. The inspector draws a sample size from ISO 2859-1 based on lot size, then rejects the lot if defects exceed the AQL table limits. Typical allocations for molded products: **critical = 0** (any structural crack or seal failure rejects), **major = 2.5**, **minor = 4.0**.

**When third-party inspection pays:** first order from a new factory, any order above roughly one container load, or whenever the buyer cannot attend in person. Cost is trivial against a rejected container — and it must be named in the contract as a release gate, not booked informally.

## Frequently asked questions

### What AQL should I specify for protective cases?

A common starting point is AQL 0 for critical defects (cracks, seal failures), 2.5 for major (latch failure, foam misfit, marking errors) and 4.0 for minor cosmetic issues, sampled under ISO 2859-1 Level II.

### What counts as a critical defect on a case?

Anything that defeats the case's function: structural cracks, gasket gaps, a latch that will not lock, a pierced valve membrane, or shell distortion that prevents closure.

### Can I rely on the factory's own QC report?

Factory reports are useful but self-graded. For first orders or large lots, independent inspection on your behalf verifies sampling was really performed against your checklist.

### Should inspected cases be tested closed or open?

Both: functional checks happen open, but seal and (if agreed) immersion tests must be run on latched, as-shipped units — the IP rating only exists in the closed state.

## Related guides

[KB-RFQ-015How to Write an RFQ for Custom Protective Cases (Buyer Checklist)](https://kexinn.org/how-to-write-case-rfq/)[KB-LOG-017Export Packing for Protective Cases: Master Cartons, Pallets and Container Loading](https://kexinn.org/export-packing-and-container-loading/)[KB-EMI-018EMI and RFI Shielding Cases: When Plastic Is Not Enough](https://kexinn.org/emi-rfi-shielding-cases/)